QCM 110 · Quality Management
Session 3 · Hour 1 · A promise, not a pile
Instructor cue 문서는 기억. 걸음이 일.
90 minNow Open · 5 min left · next Demo
PDCA walk
See the room. The want. The risk. Design the walk.
Name the step
0/4
See the room. The want. The risk. Design the walk.
Give the resource. Run the process. Keep the record.
Measure. Audit. Review. Look the number in the eye.
Fix the root. Standardize. Teach the next Tuesday.
CheckPaper is not the promise. The walk is. Walk Plan, Do, Check, Act once.