Home

QCM 110 · Quality Management

Session 3 · Hour 1 · A promise, not a pile

Instructor cue 문서는 기억. 걸음이 일.

90 minNow Open · 5 min left · next Demo

PDCA walk

See the room. The want. The risk. Design the walk.

Name the step

0/4

  • See the room. The want. The risk. Design the walk.

  • Give the resource. Run the process. Keep the record.

  • Measure. Audit. Review. Look the number in the eye.

  • Fix the root. Standardize. Teach the next Tuesday.

CheckPaper is not the promise. The walk is. Walk Plan, Do, Check, Act once.