WSP 110 · Welding Standard Procedure
Session 1 · Hour 1 · The map
Instructor cue 종이부터.
90 minNow Open · 5 min left · next Demo
The paper is before the spark
How. With what. In which range.
Name the paper
0/4
WPS. The welder’s map. How, with what, in which range.
PQR. The coupon and the numbers that proved it.
PQ test. The metal’s strength, not the welder’s trick.
WPS number. Process, P-number, serial. A tidy shelf.
CheckA spark without a WPS is a rumour. Name WPS vs PQR. PQ is the metal.