SAB 110 · Shielded Metal Arc Bead Build
Session 7 · Hour 1 · Name the lie
Instructor cue 교훈을 갈지 마라.
90 minNow Open · 5 min left · next Demo
Name the crack repair walk and the furnace number
0/6
Dimension. Structure. Property.
Tensile. Bend. Charpy. Hardness. Fatigue.
Stop hole past the tip.
Gouge U or V. Prove with dye.
Preheat seventy to one twenty. E4316.
Six twenty-five plus or minus twenty-five. One hour per twenty-five millimeters.
CheckSort the lie. Break a coupon on purpose. Stop hole, gouge, dye, preheat, E4316, then 625. Slow cool. A grind that hides a crack is a future wound. Six twenty-five is not a shop mood.