CO2 110 · CO2 Solid Wire
Session 5 · Hour 1 · The gap is a promise
Instructor cue 문 둘을 만들지 마라.
90 minNow Open · 5 min left · next Demo
The gap is a promise
CO2 110 · booth
Root gap 3 mm. Tack. Then 1G.
gaptack
Gap 3 mm. The door is even.
Name why the gap stays even
0/6
Two edges face. Same plane.
Gap two to four. A door for the root.
Root face. A shelf that stops a pour.
Tack. Holds the door. Even. Kind.
Root pass. The floor of the joint.
Cap. The roof the yard will see.
CheckPrep the groove. Set gap two to four. Jig. Tack even. 1G root. Fill if the paper asks. Cap. Look. A closed door is a lack of fusion. A wild tack is a future warp.